Last week there was more dirt moving on Sunglow Court.  There was some drying tout that had to occur after the downpour of rain we had in the first weekend of July.  After the dirt dried out the large dirt pile on Sunglow was made a bit smaller.  Quite a bit of dirt was move back into the hole on lot four.  The over dig was added back into the hole after the lot was signed off on.  We have wrapped up on lot four and it is complete as of last Friday 7/6.  Next we will be moving on to lot three and starting work there.