Sunrise Ridge Update Tuesday April 16

We have some progress to report on lot 4.  We have a basement floor.  The cement truck was there yesterday and the pictures today show that the floor is complete.

Lot 1 has seen progress this week on the hole.  There is still dirt that needs to be removed, but not as much as last week.  One good solid day with the back hoe and that hole should be completed. Even with all of the moisture that we have been receiving water still needs to be sprayed as the dirt is being moved around to minimize the dust and dirt in the air.